Installing with database in a failover cluster
In comparison to a single-server database configuration, running the Control Center database in a failover cluster makes sure that your data is accessible even in case of a server failure.
Note
For instructions on how to complete the SQL Server Failover Cluster Installation, please visit the dedicated Microsoft article.
Complete these 3 installation phases to ensure high availability for your Control Center:
Phase 1: Identifying the required users Identify the required Windows and database users.
Phase 2: Creating your database in a failover cluster Create and configure the database on your failover cluster.
Phase 3: Installing the Control Center application Install your Control Center application and connect your Control Center to the database that runs on the clustered servers.